Lehigh Valley Health Network chose Jerdon Construction for its Cedar Point Medical and Rehabilitation Site. This 16,624 SF Fit Out was completed in 5 months.

Project Highlights

  • Extensive masonry work done to support the roof structure
  • Added new front entrance, rear man door, and 16 windows all requiring new penetrations through the existing CMU walls.
  • Extensive saw cutting for the new layout of exam rooms, restrooms, and breakrooms.
  • Front Facade was partially removed to create new look for the building.
  • Extensive demolition was required revealing severely damaged substrate. All substrate was removed and replaced.
  • Significant HVAC and electrical upgrades were required as well as upsizing the gas meter.